MY字典>英语词典>estimations翻译和用法

estimations

英 [ˌɛstɪˈmeɪʃənz]

美 [ˌɛstəˈmeɪʃənz]

n.  判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数

柯林斯词典

  • N-SING 评价;看法;判断
    Yourestimationof a person or situation is the opinion or impression that you have formed about them.
    1. He has gone down considerably in my estimation.
      我对他的评价已经一落千丈。
    2. ...Lee Dixon, the best player on the pitch in his manager's estimation.
      教练心目中球场上最好的球员李·狄克逊
  • N-COUNT 估算;估价
    Anestimationis an approximate calculation of a quantity or value.
    1. In fact, the first group were absolutely correct in their estimation of this man's height.
      事实上,第一组人对这名男子身高的估计完全正确。
    2. ...estimations of pre-tax profits of £2.25 million.
      估计税前利润达225万英镑

双语例句

  • The obvious question becomes: Why are software engineers so incapable of accurate estimations?
    问题来了:为什么无法对软件工程进行精确的评估呢?
  • Over-commitment or erroneous estimations created stress points on the system test team, as well as the other members of the overall team.
    过度承诺或错误的估计对系统测试团队,以及整个团队的其他成员产生了压力。
  • No plans, no estimations, no iterations, no overhead – There is no silver bullet and no alternative to hard work, discipline, target on perfection and constant improvements.
    没有计划、没有估算、没有迭代、没有管理开销&从来不存在银弹,而且除了努力工作、纪律、追求完美和持续改进之外,别无他法。
  • Non-parametric estimations reveal that the fat tail of the distribution of stock return satisfies power law decay.
    非参数估计显示股票收益分布的非正态性及肥尾现象,其尾部满足幂律衰减。
  • The estimated results of the slopes are introduced into the EKF to get state estimations without radome interference which generates the guidance law command.
    将斜率估计结果代入EKF,得到滤除天线罩误差影响的系统状态量估计结果并形成制导指令。
  • Annotate the problem query with relevant statistics to better understand what the DB2 optimizer is using for its estimations.
    使用相关统计数据来注释有问题的查询,这样可以更好地理解DB2使用哪些内容来进行评估。
  • Statistical Comparisons on Parameter Estimations in Electromigration Tests
    电迁移测试中模型参数估计方法的比较
  • In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
    特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。
  • High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
    因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。
  • In this paper, estimations of varying-coefficient models with the correlated random errors are given by the local linear method. Furthermore, its asymptotical formalities are discussed.
    在误差相关的情况下,使用局部线性方法给出变系数模型的估计,并讨论估计的渐近正态性。