estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- The obvious question becomes: Why are software engineers so incapable of accurate estimations?
问题来了:为什么无法对软件工程进行精确的评估呢? - Over-commitment or erroneous estimations created stress points on the system test team, as well as the other members of the overall team.
过度承诺或错误的估计对系统测试团队,以及整个团队的其他成员产生了压力。 - No plans, no estimations, no iterations, no overhead – There is no silver bullet and no alternative to hard work, discipline, target on perfection and constant improvements.
没有计划、没有估算、没有迭代、没有管理开销&从来不存在银弹,而且除了努力工作、纪律、追求完美和持续改进之外,别无他法。 - Non-parametric estimations reveal that the fat tail of the distribution of stock return satisfies power law decay.
非参数估计显示股票收益分布的非正态性及肥尾现象,其尾部满足幂律衰减。 - The estimated results of the slopes are introduced into the EKF to get state estimations without radome interference which generates the guidance law command.
将斜率估计结果代入EKF,得到滤除天线罩误差影响的系统状态量估计结果并形成制导指令。 - Annotate the problem query with relevant statistics to better understand what the DB2 optimizer is using for its estimations.
使用相关统计数据来注释有问题的查询,这样可以更好地理解DB2使用哪些内容来进行评估。 - Statistical Comparisons on Parameter Estimations in Electromigration Tests
电迁移测试中模型参数估计方法的比较 - In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。 - High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。 - In this paper, estimations of varying-coefficient models with the correlated random errors are given by the local linear method. Furthermore, its asymptotical formalities are discussed.
在误差相关的情况下,使用局部线性方法给出变系数模型的估计,并讨论估计的渐近正态性。